FG Unveils ₦40 Billion CCTV Control Centre To Boost Security On Third Mainland Bridge

Published

The Federal Government has officially inaugurated a ₦40 billion closed-circuit television (CCTV) control centre on Lagos’ Third Mainland Bridge, aimed at enhancing security, curbing reckless driving, and preventing suicide attempts on the iconic structure.

The project, first announced in 2025 by the Minister of Works, David Umahi, involves the installation of advanced surveillance cameras, enabling security agencies to monitor the bridge in real time and enforce traffic regulations.

At Sunday’s inauguration, Umahi highlighted that the administration inherited significant challenges on major Lagos bridges.

“When we assumed office in 2023, we found the Third Mainland Bridge, Carter Bridge, and Iddo Bridge in dire condition—both above and below the water,” he said.

He added that President Bola Tinubu directed a full reassessment and rehabilitation of the Third Mainland Bridge, including resurfacing and replacement of expansion joints. “Lagosians appreciated the quality of this work, which remains effective to this day,” Umahi noted, praising China Civil Engineering Construction Corporation for its execution of the project.

The contract also covers security equipment for monitoring the bridge, which will be handed over to the police. “We will provide a surveillance boat and two Hilux vans to enhance monitoring. Other security agencies may also be incorporated as needed,” Umahi said. He further urged motorists to respect traffic rules, citing concerns over speeding.

Federal Controller of Works in Lagos, Olufemi Dare, described the CCTV control centre as the first of its kind in Nigeria. “I doubt any other bridge in the country has the level of monitoring deployed here, covering both the underwater and above-water structures,” he said.

The centre is equipped with a surveillance boat, two Hilux vans, 240 solar panels, 10 inverters, a 300KVA transformer, a standby generator, and multiple monitoring screens. Dare disclosed that the project cost ₦40.17 billion, with ₦36 billion already paid to the contractor. The contract also includes 1,268 solar street lights and a borehole facility.

Umahi concluded by noting that this marks the first phase of commissioning. “We will return soon for the full commissioning, including the extension of the bridge, which is nearing completion,” he said.

Author:
BushRadio